VRF condensers and heat-recovery units
Plant rooms, roof and basement plant areas
Refer to Section 5
29 listed units
Source note
The source workbook points to Section 5, which was not supplied.
OPERATIONS
FACILITY MANAGEMENT
MAINTENANCE REGISTER
A council-friendly view of shared building infrastructure, suggested service frequency and the most recently completed maintenance period.
Plant rooms, roof and basement plant areas
Refer to Section 5
29 listed units
The source workbook points to Section 5, which was not supplied.
Communal activity, gym, cinema, library, shared staff and amenity areas
Refer to Section 5
26 listed units
Apartment and unit-level fan coil units are excluded.
Car parks, fire room, bin store, cleaners areas, shared toilets, pool plant and roof terrace
Refer to Section 5
42 listed common-area units
Apartment bathroom and laundry extraction fans are excluded.
Ground-floor bin store and office
Refer to Section 5
2 listed units
Main and common switchboards
Quarterly
Common infrastructure
Common switchboards
Quarterly
Common infrastructure
Level 1
Annually
1 generator
The source records a last maintenance date of January 2024.
Site-wide entries, lifts, communications room and common areas
Not specified
Common infrastructure
Switchboards and meter-device network
Not specified
Common infrastructure
Common areas, back-of-house areas and egress routes
Not specified
Separate fitting register supplied
Power outlets, switches, isolators, sensors, timers and enclosures in common areas
Not specified
Common infrastructure
Level 1 fire control room
Monthly, annually and every 5 years
2 listed systems
ABE and CO₂ extinguishers across basement and Levels 0–15
Every 6 months
39 listed units
Basement, Level 0 and Level 1
Every 6 months
6 listed units
Level 1 duty, standby, relay and jacking pumps
Not specified
4 listed pumps
Level 1
Not specified
2 listed tanks
Basement and Levels 0–15
Not specified
35 listed valves
Basement and Levels 0–15
Not specified
17 listed valves
Basement and common plant areas
Not specified
48 listed valves
Level 2 and Level 15 common facilities
Not specified
3 listed units
First-floor pump room
Annually
1 device
First-floor pump room
Annually
1 set
First-floor pump room
Annually
4 tanks
Ground-floor services, Level 2 and Level 15 roof
Every 5 years
Heat pumps, heating units and storage tanks
Level 15 roof
Every 5 years
2 meters
Ground-floor UAT, first-floor amenities, cleaners areas and Level 2 shared facilities
As required
Common infrastructure
Apartment bathroom, kitchen and laundry fixtures are excluded.
Ground-floor cleaners areas and Level 2 kitchen
Annually and as required
Common infrastructure
Basement driveway and shared service areas
As required
Common infrastructure
Level 15 roof and common plant areas
Not specified
Common infrastructure
Level 15 roof deck anchors, strops, bases, adaptors, davit equipment and signage
Annually
40 listed components
Basement to Level 15 main lobby
Not specified
3 lifts
Ground-floor entry and lift lobbies
Not specified
13 listed doors
Ground-floor commercial kitchen and bar/café
Not specified
17 listed equipment groups
Level 2 gym
Not specified
Cardio, strength and mobility equipment
Level 2 common leisure facilities
Not specified
Common infrastructure